```php NISAN Corporation SARL | Ingénierie, Technologie et Sécurité ```
Industrial piping network installation
Home / Engineering / Industrial Piping
INDUSTRIAL PIPELINE ENGINEERING

Engineering Industrial Piping.

Design, fabrication, assembly and installation of piping networks for industrial facilities, process systems and technical infrastructure.

01 Technical Studies
02 Fabrication & Assembly
03 Inspection & Handover
NISAN CORPORATION — PIPING
PIPING SYSTEMS BUILT TO LAST

Every connection matters. Every detail counts.

Piping networks play a vital role in industrial operations. They transport fluids, connect equipment and help maintain operational continuity.

NISAN CORPORATION provides industrial piping services tailored to project requirements, including routing studies, component preparation, assembly, installation and inspections according to applicable specifications.

Discuss Your Installation ↗
OUR AREAS OF EXPERTISE

From design to installation.

A structured approach to piping projects, from defining requirements through installation and inspection.

Industrial piping engineering study
01 / ENGINEERING

Engineering & Design

Requirements analysis, routing studies and preparation of project technical documents.

Plan a Project ↗
02 NS.

Fabrication & Prefabrication

Component preparation, cutting, fitting and assembly according to project documents and requirements.

PREPARE BEFORE INSTALLATION
03 NS.

Assembly & Installation

Installation of pipe sections, supports and accessories, with attention to alignment and accessibility.

ASSEMBLE WITH PRECISION
Welding work on an industrial installation
04 / WELDING

Joining & Welding

Operations performed according to applicable project technical requirements.

INDUSTRIAL APPLICATIONS

Piping adapted to your processes.

Material selection, pipe diameter, connections and installation methods depend on the fluid, operating conditions and design requirements.

Piping network in an industrial facility
INDUSTRIAL SOLUTIONS NISAN CORPORATION
01

Fluid Piping Networks

Networks for transporting fluids compatible with specified materials and service conditions.

↗
02

Water & Utility Networks

Supply lines, distribution systems and auxiliary networks according to facility requirements.

↗
03

Process Piping

Networks connecting production and processing equipment according to design documents.

↗
04

Manifolds & Connections

Assemblies, branches and connections suited to site layout and operating constraints.

↗
i

Permitted fluids, materials and pressure classes are determined for each project from its technical requirements.

COMPONENTS & MATERIALS

The right component for the right application.

Technical selection must consider fluid properties, temperature, pressure, environment and project specifications.

MAT / 01

Pipes & Tubing

Selection of dimensions, wall thicknesses and materials according to service conditions and applicable standards.

MAT / 02

Valves & Fittings

Connection and isolation components selected according to function, compatibility and required specifications.

MAT / 03

Supports & Structures

Consideration of supports, loads, movements and accessibility for operation and maintenance.

MAT / 04

Flanges & Gaskets

Selection and assembly of connection elements compatible with network conditions and specifications.

Preparation and coordination of a piping project
PROJECT METHOD PLAN. EXECUTE. INSPECT.
OUR METHODOLOGY

A structured, step-by-step execution.

Each project is prepared according to its scope, available technical documentation, site constraints and required inspections.

01

Requirements Review

Definition of scope, data collection and review of technical requirements.

02

Engineering & Preparation

Preparation of drawings, components, intervention resources and work sequence.

03

Fabrication & Installation

Execution according to approved documents, applicable procedures and safety requirements.

04

Inspection & Handover

Required inspections, resolution of discrepancies and preparation of applicable completion documents.

QUALITY, SAFETY & COMPLIANCE

Quality starts before the first joint.

Inspection requirements, joining methods and tests are defined according to the design, risks and project specifications.

Inspection of an industrial piping installation
Q / 01

Material Verification

Verification of documents, references and component characteristics against project requirements.

Q / 02

Assembly Quality

Visual checks and inspections appropriate to the joining methods and applicable acceptance criteria.

Q / 03

Testing & Verification

Tests defined by the specifications and performed using appropriate procedures and precautions.

Q / 04

Worksite Safety

Work preparation, hazard identification and implementation of required preventive measures.

!

Pressure tests, non-destructive examinations, welding qualifications and certifications are performed according to project requirements and the necessary qualified personnel or authorised bodies.

APPLICATION ENVIRONMENTS

Different needs. The same discipline.

01

Industry & Manufacturing

Utility networks and industrial equipment connections.

02

Mining & Processing

Service piping and process networks defined by site requirements.

03

Energy & Utilities

Auxiliary networks and technical connections according to the applicable design.

04

Technical Infrastructure

Networks and installations adapted to building and infrastructure requirements.

FREQUENTLY ASKED QUESTIONS

Before starting your project.

A few important points when preparing an industrial piping request.

What information is needed for a quotation? +

Where possible, provide the scope of work, available drawings, dimensions, fluid type, operating conditions, estimated quantities and site constraints.

Can you work on an existing installation? +

Work on an existing network can be assessed after reviewing its condition, available documentation, operating conditions and necessary safety measures.

Are materials selected according to the transported fluid? +

Yes. Selection must consider chemical compatibility, pressure, temperature, corrosion, service conditions and design requirements.

What checks may be required before commissioning? +

Depending on the project, checks may include visual inspection, joint verification, non-destructive examination, leak or pressure testing and document review. Exact requirements are determined by the applicable specifications.

NISAN CORPORATION SARL / INDUSTRIAL ENGINEERING

Your next piping project starts here.

Share your drawings, specifications or simply describe your requirements. We can review the project scope and identify the next steps.

```